Java Integrated Industrial and Ports Estate

Kawasan Ekonomi Khusus, Gresik, East-Java - Indonesia

kawasan industri gresik jiipe

Articles & News About the Industrial Zone JIIPE in Gresik

Encouraging Development Speed, East Java Industrial Zone JIIPE Builds Three Power Plants

Encouraging Development Speed, East Java Industrial Zone JIIPE Builds Three Power Plants

With all the available and integrated facilities, JIIPE East Java Industrial Estate can be considered as a one-stop industrial estate. One of the facilities that greatly support the sustainability of production activities in JIIPE East Java Industrial Estate is the power plant.

JIIPE East Java Industrial Estate has three power plants consisting of 15 MW PLTG, 500 MW PLTG, and 660 MW PLTB. The three power plants were built in collaboration with PT Pelindo III and PT AKR.

The Minister of Industry believes that the construction of power plants in the JIIPE East Java Industrial Estate is in line with the government's program to encourage the acceleration of development in the JIIPE East Java Industrial Estate. Industrial estates with integrated infrastructure such as the JIIPE East Java Industrial Estate will increase efficiency and can cut logistics costs by up to 20%.


새로운 도약: 그레식 경제특구 내에 출입국 서비스 개설

그레식, 2025년 11월 12일 — 동자바의 투자 경쟁력 강화를 위한 노력이 또 한 번 진전을 이...

Gresik SEZ Launches Auto Gate Customs System Pilot to Accelerate Logistics Flow

Gresik, October 17, 2025 – The Gresik Special Economic Zone (SEZ) has begun implementing a digital-based logistics syst...


산업용지 취득 예약 / 제안 요청서

이 양식은 JIIPE SEZ 내에서 산업용지 취득에 진정으로 관심 있는 기업을 위한 것입니다. 당사의 요구사항을 평가하고 최적의 솔루션을 제공하기 위해 정확한 정보를 제공해 주시기 바랍니다.

All fields marked with an asterisk (*) are mandatory

기본 정보

JIIPE를 고려하는 이유 *
(Ha)

필요한 에너지 및 유틸리티
MW
m³/day
MMBTU/annum
Tons/Year