Java Integrated Industrial and Ports Estate

Kawasan Ekonomi Khusus, Gresik, East-Java - Indonesia

kawasan industri gresik jiipe

關於JIIPE工業區的新聞和報導

AKR Corporindo (AKRA) and Pelindo III begin construction of the second phase of JIIPE

AKR Corporindo (AKRA) and Pelindo III begin construction of the second phase of JIIPE

PT AKR Corporindo Tbk (AKRA) together with Pelindo III built the Java Integrated Industrial and Port Estate (JIIPE) mega project in Gresik, East Java. The 3,000 hectare project will be built in three stages and in 2018 the first phase will be completed. AKRA is now preparing the second phase of development.

The second phase will be carried out throughout 2019 until 2022. At this stage AKRA will build an industrial area on 265 hectares of land, and increase the capacity of the PLTG by 500 MW.

Investment in the first phase has absorbed funds of more than Rp 5 trillion. The first phase has been carried out from 2013 to 2018 which successfully operated a 23 megawatt (MW) gas power plant (PLTG), 112 hectares of reclamation area, a 500 meter pier with a depth of 14 meters, then a 430 meter bridge and others.

Business Development & JV Relationship AKRA Suresh Vembu said, the business that will be built until 2022 is expected to provide recurring income for AKRA by 15% -20% on a consolidated basis.

"The JIIPE project also offers a competitive energy service that is using PLTG to meet its electricity needs," he explained during a public exposure on the Indonesia Stock Exchange (IDX), Tuesday (27/8).

Also Read: Following are a number of AKR Corporindo (AKRA) plans for the retail BBM segment

Suresh explained that he had seen the potential for improvement in the mining and power generation sectors. Suresh said that one of AKRA's investment plans in this business is to build a power plant of 300 mega watts (MW) - 500 MW in stages.

Investment in this sector for 300 MW amounts to US $ 350 million to US $ 400 million so that the maximum investment that will be issued up to 500 MW is around US $ 700 million. AKRA opens up opportunities from banks as a source of funding.

https://investasi.kontan.co.id/news/akr-corporindo-akra-dan-pelindo-iii-memulai-pembangunan-jiipe-tahap-kedua


2025:銅短缺之年——為什麼全球都在看向印尼

銅,被譽為「電氣化金屬」,正處於全球邁向更綠色、更連接世界轉型的核心。2025年,全球...

印尼在全球銅供應未來中的戰略角色

每一條電力電纜、電動車(EV)電池和風力發電機的背後,都離不開一種關鍵元素:銅。...


工業用地收購預約 / 徵求提案

本表僅供真正有意在JIIPE SEZ內獲取工業用地的企業使用。請提供準確的詳細信息,以協助我們評估您的需求並提供最佳解決方案。

All fields marked with an asterisk (*) are mandatory

Basic Information

The reason for considering JIIPE ? *
(Ha)

Energy & Utility Needs
MW
m³/day
MMBTU/annum
Tons/Year